Colmore Row, Birmingham

Specialist Subcontractor

Scope of Works

  • Removal of all fixtures and fittings and set aside for re-use.
  • Removal of all skirtings and door frames.
  • Removal of all damp effected plaster from walls.
  • Overhaul leaking pavement lights and leave watertight.
  • Cut out drainage channel to basement perimeter and install Delta drainage channel, laid to falls to pumped sump.
  • Installation of Delta sump pump.
  • Fix Delta cavity drain membrane system to affected walls.
  • Installation of foil backed, moisture resistant plaster board to treated area and apply skim coat of plaster.
  • Supply and fix new skirting boards, door frames and architraves.
  • Decorate upon completion.